MET Project Protocol

Introduction

This wiki page is to record communication and activities associated with Martin Smith and the MET Project. The goal is to assist planning and ensure that we have an audit trail of our discussions and the work we have performed/promised.

Protocol

2009.09.04 MS Requests AH to Upload Q2 Documents

2009.10.13 Meeting with József Rékai, Ken Little at EUROMETRO (09:00-10:45)

  1. Discussion about fire protection documentation. Target: file list till the 16th of Oct.

2009.10.13 Meeting MS at EUROMETRO (10:45-13:00)

  1. Requirements for the MET System

2009.10.16 Meeting MS at EUROMETRO (11:30-14:30)

  1. Requirements for the MET System

2009.11.15 TN Visit to MS Office (15:00-18:30)

  1. Discussion about uploading Q3 documents

2009.11.10 TN Prepares Uploading of Q3 Documents

  1. Preparing upload metadata and files
  2. Files loaded only into the test system, quality of the the data is bad

2009.11.18 TN Visit to MS Office (09:30-16:00)

  1. Meeting about master document list

2009.11.26 TN DrawMGT Training at DBR Office (13:00-05:00)

  1. Basic training
  2. DBR peoples (András Bleyer, Kinga Pétervári) are not satisfied

2009.11.27 TN Uploads Q3 files Into DrawMGT (10:00-15:00)

  1. Preparing upload metadata and files
  2. Files loaded only into the test system, quality of the the data is still bad

2009.12.04 TN Visit to MS Office (08:45-11:00)

  1. Consultation about Classification aspects

2009.12.08 TN Installs New Aspect Tree

  1. TN got new aspect aree and installed it on both systems

2009.12.14 TN Installs New Aspect Tree

  1. BAMCO Claims are added, installed it on both systems

2009.12.16 TN DrawMGT Training at DBR Office (13:00-05:00)

  1. Basic training
  2. DBR peoples (András Bleyer, Kinga Pétervári) are not satisfied

2009.12.21 TN Uploads Q3-Q4 Files (14:30-02:30)

  1. TN got new Master Document List and Q3-Q4 files
  2. Quality of data is much better as before
  3. About 600 files loaded up into the test system

2009.12.22 TN Installs New Aspect Tree

  1. Activity Codes added, installed it on both systems

2009.12.22 TN Uploads Q3-Q4 Files (14:30-18:50)

  1. About 600 files loaded up into both systems

2009.12.23 MS Emails Start to Bounce

  1. From this date onwards emails sent to Martin Smith bounce
  2. The only way to contact Martin is via telephone/sms or via email to Edina

2010.01.05 TN Visit to MS Office (13:00-18:00)

  1. Clarifying terms of DrawMGT (MET System User Manual)
  2. DrawMGT change requests
    • Menu groups Folder and Group should be moved to top position in left menu

    • Change font of status information for better visibility
    • All groups should be closed in left menu at first login
    • Document Code Components block should be opened at first login
  3. Some menu, list items should be changed
    • Folders
      • Claims/Commercial -> Claims

      • Matrix Admin -> Admin

    • Document -> Document file

    • Document type -> Document format

      • Report -> Report Format

      • Program -> Program Format

      • Plan -> Drawing Format

      • Analysis - to be removed
    • Delete name of aspect values group in "Key Aspect" select list
  4. Some select list must be bi-lingual
    • Phase
    • Discipline
    • Classification status
    • Revision type
  5. DrawMGT training for Edina Bodor

2010.01.05 TN DrawMGT Training at MS Office (09:00-13:00)

  1. Training to Edina Bodor to insert/update/delete Documents
  2. Training to Edina Bodor to create/update Users

2010.01.18 MS Requests TN to Update Classification Aspects

  1. TN got translation and update requests based on an obsolete file
  2. Email sent to MS to solve the problem, no update done in the database

2010.01.28 AH/MM Meeting

2010.01.28 Meeting at DBR

Present:

Discussion:

  1. Claims spreadsheet
  2. Handbook
  3. Explained that we have no plan
  4. Explained that we have not spent any effort of public relations
  5. Explained that we need short checklists explaining commonly performed procedures (in wiki)

2010.02.01 AH / AB (Andras Bleyer) Telephone call

  1. Andras says:
    • Not completely satisfied with the result of last weeks meeting
    • Martin has until the end of this week to produce the finished handbook
    • He agrees that AH/TN can perform public relations works to help acceptance of the system (and probably that we can perform them)
  2. I said to him:
    • I want to adopt Mary McGrath's working methods (e.g. use of a written plan, instructions and tracking)

    • I want to force Martin to produce a plan to the end of the quarter with:
      • List of required inputs
      • List of activities
      • List of deliverable
    • I want to upload Mary's documents directly with TN and MM and her assistant(s).
      • Goal of showing that it works well if you're organized
  3. Next steps:
    • Wail until end of week to see the state of the handbook
    • Write email to Martin explaining how we will proceed (& BCC Andras/Kinga)

    • Write an outline for a plan for MET DrawMGT
    • Get list of procedures/fields from MM

2010.02.02 Instruction from Edina

2010.02.03 MET Task List

Task list from meeting Tibor Nagy, Martin Smith and Edina Bodor on 2010.02.03

2010.02.03 TN Visit to MS Office (09:00-16:00)

2010.02.04 New Aspect Tree got from MS

2010.02.08 Email from Martin Smith

Attached Files:

Notes:

2010.02.08 Instruction from Martin Smith

Attached Files: