# Hydropower Demo # 2014.08.04 # Classification Fields # Comments # - data type (including "values from") should be included in configuration file # - aliases should be included in configuration file # - SUGGESTION: add a field for default object "root" code for each object sub-type (presumably a configurable system field) # # -- General -- DESCRIPT Description PHASE Project Phase FEAS Feasibility BASIC Basic Engineering TEND Tendering CONST Construction COMMG Commissioning DELIV Deliverable DELIV-1 Deliverable 1 DELIV-2 Deliverable 2 DELIV-3 Deliverable 3 MS Milestone MS-1 Milestone 1 MS-2 Milestone 2 MS-3 Milestone 3 LOC Location GEN General DAM Main Dam HRT Headrace Tunnel PS Pressure Shaft PH Powerhouse TR Tailrace ELEV Elevation CHAIN Alignment Chainage Dam Main Dam Axis HRT Headrace Tunnel Alignment # Alan has some ideas about improving the use of project coordinates as classification field COORDS Project Coordinates UTM UTM coordinates (zone xx) EAST Easting NORTH Northing WGS84 WGS84 LAT Latitude LONG Longitude WORK Work Type LAYOUT General Layout INST Contractor Installations EXCV Excavation and Fill ROAD Roadwork SUPP Ground Support DRILL Drilling GROUT Grouting CONC Concrete REINF Reinforcement METAL Metalwork HYDRO Hydromechanical BOP Balance of Plant ELECT Electrical INSTR Instrumentation and Control ACTIV Activity Type DES Design SCHED Scheduling COST Costing CONST Construction SUPV Supervision QC Quality Control HSE HSE CONTR Contract Management DISCIP Discipline GEOT Geotechnical CIVIL Civil STRUCT Structural HYDR Hydraulic HYDRO Hydromechanical MECH Mechanical ELECT Electrical CONTRACT Contract DAM Dam Main Contract HRT Headrace Main Contract PH Powerhouse Main Contract # as discussed with Alan, aliases should be inroduced for all classificaton fields with the same data list ISSUER Issuer Organisation which issues, authors or sends documents CONSULT Engineering Services Consultant CLIENT Project Owner RECIP Recipient CONSULT Engineering Services Consultant CLIENT Project Owner # the following classifications are temporary until workflow is enabled RESP Responsible DUE Due Date COMPL Complete Date # # -- Documents -- ALT Alternate Document Code SCALE Drawing Scale PAPER Paper Size A3 A3 A4 A4 # # -- Document Revisions -- REASON Reason For Issue "Reason for Issue for e.g. Drawing Revision,such as For Review, Good for Construction" # # -- Tasks -- WORK-DOC Working Document # the following classifications are temporary until Notes can be attributed with stauts QUEST Question TQ question ANSW Answer TQ answer # the following classifications are temporary until workflow is enabled STATUS Status OPEN Open ANSWD Answered CLOSED Closed REOPEN Reopened OBSOL Obsolete # # -- Project Team -- CONTACTS Contacts Mobile Mobile Phone Office Office Phone Skype Skype Name