== Budapest Visit: 19-22 Octiber 2009 == == To Do List == |
Line 8: | Line 9: |
1. TN able to support NOK system by early December. |
1. Goal: TN able to support NOK system by early December. * Need to get NOK system running * AH on Holiday 6-18 December |
Line 10: | Line 13: |
1. Setup new MET server (TN waiting for delivery, expected approx. 24-Oct) |
1. Setup new MET server: * FreeBSD with APache 2.2(?) and Mysql 5.4 (?) * TN waiting for delivery, expected approx. 24-Oct * AH to provide server setup notes (in Wiki) * Base OS install (including configuration of disk mirroring) * Application installation: Apache, MySQL and other required tools * DNS and related setup * Backup procedures 1. Plan technical updates and DB model changes for MET system: * Fields for ''Front Page'' * Doc-to-Doc (and Task-to-Task) links * Incoming serial number (in Drawings table), suggested format: '''YYYYMMDDnnn''' 1. DB Model and Technical Solution for Multi-Classification (for MET) * To be implemented as release V12.1 (e.g. mark current leading edge as V12.0 BRANCH * Includes solution for classification '''from-to''' values 1. Implement Release-Submit workflows and Approval N/A approval status (see below) 1. NOK System Re-COnfiguration * See documents ? 1. MET System CVS update * Make sure '''beta''' system is being backed up * Make backup (to lu.softxs.ch:/home/backup) of app, lib and cfg directories === Other Low-Priority Items === 1. Install/demonstrate Sybase !PowerBuilder application 1. Review/catalog TN suggestions for DrawMGT application improvements 1. Wiki installation for new HU server 1. Copy older emails into a new DrawMGT user wiki ---- |
Line 55: | Line 92: |
---- |
Planning
Budapest Visit: 19-22 Octiber 2009
To Do List
- Goal: TN able to support NOK system by early December.
- Need to get NOK system running
- AH on Holiday 6-18 December
- Setup new MET server:
- FreeBSD with APache 2.2(?) and Mysql 5.4 (?)
- TN waiting for delivery, expected approx. 24-Oct
- AH to provide server setup notes (in Wiki)
- Base OS install (including configuration of disk mirroring)
- Application installation: Apache, MySQL and other required tools
- DNS and related setup
- Backup procedures
- Plan technical updates and DB model changes for MET system:
Fields for Front Page
- Doc-to-Doc (and Task-to-Task) links
Incoming serial number (in Drawings table), suggested format: YYYYMMDDnnn
- DB Model and Technical Solution for Multi-Classification (for MET)
- To be implemented as release V12.1 (e.g. mark current leading edge as V12.0 BRANCH
Includes solution for classification from-to values
- Implement Release-Submit workflows and Approval N/A approval status (see below)
- NOK System Re-COnfiguration
- See documents ?
- MET System CVS update
Make sure beta system is being backed up
- Make backup (to lu.softxs.ch:/home/backup) of app, lib and cfg directories
Other Low-Priority Items
Install/demonstrate Sybase PowerBuilder application
- Review/catalog TN suggestions for DrawMGT application improvements
- Wiki installation for new HU server
- Copy older emails into a new DrawMGT user wiki
Planning: NOK - Linthal 2015
- Goal of being live by end of first week of December 2090
Roll-Out Schedule
KW 43: 19-23 Oct 2009
- Konfiguration bereinigen (gmm)
- Beispieldokumente zusammentragen (biem, hamr, gmm)
- Testsystem mit neuer Konfiguration updaten (SoftXS)
24.10.2009: Testsystem gemäss Konfiguration vom 19.10.2009 bereit für Erfassung der Beispieldokumente (SoftXS)
KW 44: 26-30 Oct 2009
- Beispieldokumente erfassen (biem, hamr, gmm)
- Testsystem testen und Konfiguration bereinigen (gmm, biem, hamr)
- Benutzerrollen und Benutzer für Testphase definieren (gmm, biem, hamr)
KW 45: 2-6 Nov
- Testsystem gemäss Vorgaben updaten (SoftXS)
- Benutzerhandbuch für Projekt PSW Limmern erstellen (SoftXS)
- Checklisten für Benutzer erstellen (gmm, biem, hamr)
6.11.2009: Testsystem mit neuem Prozess "Freigabe" und Status "nicht erforderlich" ergänzt.
6.11.2009: Benutzerrollen und Benutzer für Testphase ergänzt.
KW 46: 9-13 Nov 2009
- Schulung Projektleiter (gmm, SoftXS)
KW 47: 16-20 Nov 2009
- Testen durch Projektleiter, Ergänzungs- und Änderungsvorschläge an gmm
- Testsystem updaten (SoftXS)
- Import Solldokumentenliste / Planlieferprogramme vorbereiten (biem, hamr)
KW 48: 23-27 Nov 2009
- Inbetriebsetzung Produktivsystem auf Axpo-Server (SoftXS)
- Solldokumentenliste / Planlieferprogramme importieren (SoftXS)
ab KW 49: 30-Nov
- Schulung Projektbeteiligte
- Datenmigration 1. Schritt