This section describes a proposal for handling updates made to planned workflow deadlines on the DrawMGT server, which can be overwritten by the automatic plan date calculations in the Excel spreadsheet. This section describes a proposal for handling updates made to plan dates in revision workflows using DrawMGT's web interface. This is to solve the problem that plan dates entered via a browser are overwritten by the plan date calculations in the Excel spreadsheet.
Line 13: Line 15:
In the Excel spreadsheet, the plan date for a workflow step in a revision is calculated based on: In the Excel spreadsheet, the plan date for a revision's workflow step is calculated based on:
Line 18: Line 20:
Normally the plan date calculations are performed in the Excel spreadsheet and the results are stored in the DrawMGT database, where they can be viewed from a web browser.
In the Excel spreadsheet, the plan dates fields are ''read-only'' fields and can only be changed indirectly by changing the ''T0'' and ''delta'' fields.
Normally the plan date calculations are performed in the Excel spreadsheet and the results are stored in the DrawMGT database. 
Using the Excel spreadsheet, the plan dates fields are always calculated and the results are displayed in ''read-only'' columns. The plan dates can only be changed indirectly by changing the ''T0'' and ''delta'' fields. This means than the plan dates and delta fields for a series of revisions are always ''consistent''.
Line 21: Line 23:
It is also possible for users to use DrawMGT's web interface to make updates to a revision's plan dates and delta fields without regard to the calculations which should be performed. It is easily possible to create inconsistent data where the plan dates stored in the database do not match those that would be calculated from the ''T0'' and ''delta'' fields. The plan dates and delta information can also be viewed and updated using using DrawMGT's web interface.
When using DrawMGT's web interface it is possible to save plan dates and delta fields without regard to the calculations performed by the Excel spreadsheet. Thus, when using a browser it is easy to create inconsistent data, where plan dates do not match those that would be calculated by the Excel spreadsheet.
Line 23: Line 26:
When workflow information is read into the Excel spreadsheet the plan dates values from the database are ignored and values calculated in the spreadsheet are displayed instead. This can result in the loss of plan date data entered via the browser.
 
The problem is that when workflow information is read into the Excel spreadsheet, plan dates values from the database are ignored and replaced by values calculated locally in the spreadsheet. The result is the loss of any plan date information entered via the browser that is not consistent with the ''T0'' and ''delta'' values.

The problem is compounded because the ''T0'' field, the initial value from which all the plan dates are calculated, is stored in a ''used defined'' field in the DrawMGT database and can only be entered and updated via the Excel spreadsheet. This means that all currently entered plan date values are at risk of being overwritten by the Excel spreadsheet.


= Proposed Solution =

The proposed solution has two parts:

 1. Augmenting existing plan date data with consistent ''T0'' and ''delta'' values
 1. Highlighting inconsistent plan dates in the Excel spreadsheet giving users the chance to correct it

== Augmenting Existing Plan Date Datas ==

The plan date data currently stored in the production database does not have any ''T0'' or ''delta'' values associated with it.

== Highlighting Inconsistent Plan Dates ==

Excel Integration - Handling Server Updates

Introduction

This section describes a proposal for handling updates made to plan dates in revision workflows using DrawMGT's web interface. This is to solve the problem that plan dates entered via a browser are overwritten by the plan date calculations in the Excel spreadsheet.

Plan Date Calculations

In the Excel spreadsheet, the plan date for a revision's workflow step is calculated based on:

  1. The plan date field associated with the following workflow step, or the T0 field for last workflow step

  2. The delta field associated with the workflow step

Normally the plan date calculations are performed in the Excel spreadsheet and the results are stored in the DrawMGT database. Using the Excel spreadsheet, the plan dates fields are always calculated and the results are displayed in read-only columns. The plan dates can only be changed indirectly by changing the T0 and delta fields. This means than the plan dates and delta fields for a series of revisions are always consistent.

The plan dates and delta information can also be viewed and updated using using DrawMGT's web interface. When using DrawMGT's web interface it is possible to save plan dates and delta fields without regard to the calculations performed by the Excel spreadsheet. Thus, when using a browser it is easy to create inconsistent data, where plan dates do not match those that would be calculated by the Excel spreadsheet.

The problem is that when workflow information is read into the Excel spreadsheet, plan dates values from the database are ignored and replaced by values calculated locally in the spreadsheet. The result is the loss of any plan date information entered via the browser that is not consistent with the T0 and delta values.

The problem is compounded because the T0 field, the initial value from which all the plan dates are calculated, is stored in a used defined field in the DrawMGT database and can only be entered and updated via the Excel spreadsheet. This means that all currently entered plan date values are at risk of being overwritten by the Excel spreadsheet.

Proposed Solution

The proposed solution has two parts:

  1. Augmenting existing plan date data with consistent T0 and delta values

  2. Highlighting inconsistent plan dates in the Excel spreadsheet giving users the chance to correct it

Augmenting Existing Plan Date Datas

The plan date data currently stored in the production database does not have any T0 or delta values associated with it.

Highlighting Inconsistent Plan Dates