Planning

Budapest Visit: 19-22 October 2009

To Do List

  1. Goal: TN able to support NOK system by early December.
    • Need to get NOK system running
    • AH on Holiday 6-18 December
    • TN on Holiday 18-22 November (Thu-Sat)
    • TN would like to be at home Wed evenings (11 Oct to 25 Nov)
  2. Setup new MET server:
    • FreeBSD with Apache 2.2(?) and Mysql 5.4 (?)
    • TN waiting for delivery, expected approx. 24-Oct
    • AH to provide server setup notes (in Wiki)
      • Base OS install (including configuration of disk mirroring)
      • Application installation: Apache, MySQL and other required tools
      • DNS and related setup
    • Investigate encrypted file system (GEOM based, see sec. 18.6 in FreeBSD handbook)
    • Backup procedures
  3. Plan technical updates and DB model changes for MET system:
    • Fields for Front Page -- Better requirements needed from Martin Smith

    • Doc-to-Doc (and Task-to-Task) links
    • Multiple files per revision
    • Incoming serial number (in Drawings table), suggested format: YYYYMMDDnnn

      • Includes ability to have null drawing codes (with id as alternate identifier)
  4. DB Model and Technical Solution for Multi-Classification (for MET)
    • To be implemented as release V12.1 (e.g. mark current leading edge as V12.0 BRANCH
    • Includes solution for classification from-to values

  5. Implement Release-Submit workflows and Approval N/A approval status (see below, and ReleaseSubmitWorkflow)

  6. NOK System Re-Configuration
    • See documents from Axpo/NOK (Stored at ?)
  7. MET System CVS update -- DONE

    • Make sure beta system is being backed up

    • Make backup (to lu.softxs.ch:/home/backup) of app, lib and cfg directories

Other Low-Priority Items

  1. Install/demonstrate Sybase PowerBuilder application -- DONE

  2. Review/catalog TN suggestions for DrawMGT application improvements (See SuggestedDrawMGTEnhancements)

  3. Wiki installation for new HU server
  4. Copy older emails into a new DrawMGT user wiki
  5. Review update group/workflow/layout


Planning: NOK - Linthal 2015

  1. Goal of being live by end of first week of December 2009

See NOK Configuration

Roll-Out Schedule


Planning: MET - Budapest Metro Line 4

  1. Goal of showing progress during the Q4 2009

    • Implement Multi-Classifications (See MultiClassification)

    • Add additional ICS Classification Values:
      • Stations?
      • Contracts
    • Migrate a significant set of documents into the system
    • Setup a project Wiki for MET users with an initial set of checklists (in EN & HU languages)

    • Setup HU server (Is this a high priority task?)

Planning (last edited 2009-10-20 16:15:48 by 183-56-147)