IDP Configuration
Contents
Project Overview
The project is to refurbish the Isal aluminum production plant, and add additional production capacity, of the existing plant just south of Reykjavik, Iceland.
The project owner is Rio Tinto. The project is currently (2009-Q4) on-hold and has not yet received an official notice to proceed.
Our customer is HRV, a consortium of Icelandic engineering companies, which includes Verkis (formerly VST).
The project has a minimal staff and is surviving with month-to-month payments from Rio Tinto. It is likely, as the economy and aluminum prices improve, that the project will be activated. One statement was that the project was too expensive to cancel.
The project team is currently do procurement and design tasks.
Contact Information
Contact Addresses
Office Address
- IDP Project
- Bildshofda 9
- 110 Reykjavik
- Iceland
Contract Names
Name
Description
Email
Phone
Sigríður Sigmundsdottir
Main contact for system configuration, Lead Document Controller
Direct: +354 575-2561, Mobile: +354 848-6071
Halla Katrín Svölu- & Arnardóttir
Former (until Dec 2010) contact for system configuration, Lead Document Controller, Verkis employee. Still on project in a different role
Direct: +354 575 4704, Mobile: +354 843 4999
Anna María Einarsdóttir
Document Control Manager (former contact, not sure if she is still on project)
Direct: +354 575 2563, Mobile: +354 858 0515
Helgi Geirharðsson
Service & Material Handling Manager, initial contact who recommended HRV buy the system
Direct: +354 575 4771, Mobile: +354 896 9777
Discussions and Input Data
Phone call AH/Halla 2009-11-23?
- They want to implement revision workflows
Turned off production --> test mirroring, until Halla requests that it be reactivated again
Project to DrawMGT Classification Field Mappings
- The IDP system is version 11.3
- The IDP system has a large number of custom templates
IDP Name
DrawMGT Name
DB Field Name
Notes
Area/WBS
Contract
contractId
Numeric codes
Group
Group
groupId
Internal/General for each Area
Discipline
Discipline
categoryId
Engineering discipline
Area
Location
locationId
Contract specific
Engineering Package
Work Type
workTypeId
Contract specific
Document Spec
Alignment
alignmentId
Tree structured
Project
Project Phase
projectPhaseId
ICC, IDP, IPU
Procurement Package
Work Category
workCategoryId
Alphanumeric codes
FEL
KKS-Process
kksProcess
Appendix
KKS-Installation
kksInstallation
Note
KKS-Location
kksLocation
unused
Site Classification 1
siteClassification1Id
Commented out in templates
unused
Site Classification 2
siteClassification2Id
Commented out in templates
unused
Site Classification 3
siteClassification3Id
Commented out in templates
Estimated Hours
Elevation From
Elevation From
unused
Elevation To
Elevation To
Commented out in templates
unused
Chainage From
Chainage From
Commented out in templates
unused
Chainage To
Chainage To
Commented out in templates
IDP Document Coding System
Drawing Code
The drawing code is DC11 (drawingCodeTypeId=23).
Document Code
-
Revision Code
File Extension
IDP
-
999
-
BB
-
PPP
-
999
-
9
.xxx
Drawing Code Components
Part
Description
DrawMGT Mapping
IDP
Project designation (IDP, ICC, IPU)
projectPhaseId
999
Work breakdown structure
locationId
BB
Document type
alignmentId
PPP
Procurement package (999 or XXX)
workCategoryId
999
Sequence number
sequenceNo
The revision number starts with 1, and is up to two digits with no leading zero.
System Deployment
Server
Production and Test System
- Current production and test version is V11.3.
System URL: idp.softxs.ch
- Deployed on zg.softxs.ch
Virtual hosting used to map zg.softxs.ch --> idp.softxs.ch
- A test and production system will be deployed. Test system will be copied from production system every morning, including data files.
Beta System
- Current beta system is V11.5
Beta System URL: idp.softxs.ch/beta
- Deployed on zg.softxs.ch
Virtual hosting used to map zg.softxs.ch --> idp.softxs.ch
- Beta system will be copied from production system every morning, excluding (commented out in crontab) data files.