Market - Testimonials
Implementing DrawMGT for the Kárahnjúkar project made drawing submittals easy and provided the entire team with quick access to project documents. Acceptance by project engineers was high. I hope to use DrawMGT in future projects. - J. Kaelin, Lead Tunnel Engineer, Pöyry
DrawMGT saved lots of time for me at Kárahnjúkar project. The system has fast response time. Designers can quickly send me drawings, and I can respond with my comments easily. If project site is far away and designers are not at the site, it is very important to have a system that supports collaboration between teams. - Bjarni Jónsson, Deputy Resident Engineer, KSJV, Kárahnjúkar HEP Powerhouse Area
We chose DrawMGT document management platform for Linthal 2015 Hydroelectric project, the construction of a 1000 MW pump-storage facility with a total project cost of approximately CHF 2.1 billion. DrawMGT is the only product that completely satisfied our document workflow and document classification requirements. - Director of Project Support, Linthal 2015 Hydroelectric Project, Axpo
DrawMGT significantly improves the transparency and efficiency of our document preparation and approval process. This improved the collaboration with our project partners and helped us resolve design issues in a timely and effective manner. - Project Coordinator, Nant de Drance Pumped Storage Power Plant
Even though I was only involved in the Kárahnjúkar project for a few months, I was still able to use DrawMGT to find drawings without needing any training. - Site Supervisor, ISTAK
DrawMGT worked well for my use in Kárahnjúkar project. We often had a bad connection at the site, but I could still easily retrieve the needed drawings. – Project Engineer, ÍSTAK
Next: Market - Case Studies