DrawMGT Knowledge Market Services SoftXS
Differences between revisions 3 and 4
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
 * ''We chose DrawMGT document management platform for Linthal 2015 Hydroelectric project, the construction of a 1000 MW pump-storage facility with a total project cost of approximately CHF 2.1 billion. DrawMGT is the only product that completely satisfied our document workflow and document classification requirements.'' - '''Director of Project Support, Linthal 2015 Hydroelectric Project, Axpo'''
Line 12: Line 14:

 

Market - Testimonials

jkaelin.jpg

  • Implementing DrawMGT for the Kárahnjúkar project made drawing submittals easy and provided the entire team with quick access to project documents. Acceptance by project engineers was high. I hope to use DrawMGT in future projects. - J. Kaelin, Lead Tunnel Engineer, Pöyry

  • DrawMGT saved lots of time for me at Kárahnjúkar project. The system has fast response time. Designers can quickly send me drawings, and I can respond with my comments easily. If project site is far away and designers are not at the site, it is very important to have a system that supports collaboration between teams. - Bjarni Jónsson, Deputy Resident Engineer, KSJV, Kárahnjúkar HEP Powerhouse Area

  • We chose DrawMGT document management platform for Linthal 2015 Hydroelectric project, the construction of a 1000 MW pump-storage facility with a total project cost of approximately CHF 2.1 billion. DrawMGT is the only product that completely satisfied our document workflow and document classification requirements. - Director of Project Support, Linthal 2015 Hydroelectric Project, Axpo

Next: Market - Case Studies