 * ''DrawMGT worked well for my use in Kárahnjúkar project. We often had a bad connection at the site, but I could still easily retrieve the needed drawings.'' – '''Project Engineer, ÍSTAK'''

Market - Testimonials

jkaelin.jpg

  • Implementing DrawMGT for the Kárahnjúkar project made drawing submittals easy and provided the entire team with quick access to project documents. Acceptance by project engineers was high. I hope to use DrawMGT in future projects. - J. Kaelin, Lead Tunnel Engineer, Pöyry

  • DrawMGT saved lots of time for me at Kárahnjúkar project. The system has fast response time. Designers can quickly send me drawings, and I can respond with my comments easily. If project site is far away and designers are not at the site, it is very important to have a system that supports collaboration between teams. - Bjarni Jónsson, Deputy Resident Engineer, KSJV, Kárahnjúkar HEP Powerhouse Area

  • We chose DrawMGT document management platform for Linthal 2015 Hydroelectric project, the construction of a 1000 MW pump-storage facility with a total project cost of approximately CHF 2.1 billion. DrawMGT is the only product that completely satisfied our document workflow and document classification requirements. - Director of Project Support, Linthal 2015 Hydroelectric Project, Axpo

  • DrawMGT significantly improves the transparency and efficiency of our document preparation and approval process. This improved the collaboration with our project partners and helped us resolve design issues in a timely and effective manner. - Project Coordinator, Nant de Drance Pumped Storage Power Plant

  • DrawMGT worked well for my use in Kárahnjúkar project. We often had a bad connection at the site, but I could still easily retrieve the needed drawings.Project Engineer, ÍSTAK

Next: Market - Case Studies