V2 Road Map
List of Upcoming Releases
MVA (V2ReleaseMVA) - V2 to Reviews and First Paying Customer (Attractive & Stable)
R1 (V2Release1) - Organising and Sharing Information (Compelling & Stable)
R2 (V2Release2) - Structured Collaboration (Workflows)
R3 (V2Release3) - Project Management (?)
R4 (V2Release4) - Scheduling (?)
R5 (V2Release5) - Cost Control (?)
Notation
Business Values
Taken from the Business Value classification field in the tracking system.
[B1] - Critical
[B2] - Important
[B3] - Moderate
[B4] - Nice to have
[B5] - If time available
Priorities
[P1] - In the next release
[P2] - Nice to have
[P3] - Can wait
Difficulty Ratings
Expresses the difficultly of implementing a feature.
* - Easy to implement
** - Less easy
*** - Difficult or lots of effort required
**** - Very difficult, requires a significant rewrite or redesign
Features to Assign to Releases
Note that the lists below should be augmented/reconciled with the lists of business and technical features in section 7 of the SoftXS V2 Business Plan (SXS-T-000452.5).
Business Features
- Meeting minutes manager.
Automatic production of meeting agendas & meeting minutes
- Reminders to attend meeting
- Assign tasks to meetings
- Integration with project calendar
Agendas & minutes based on site specific templates
- Cross references between documents/revisions, tasks and the meetings
- Project diary
- Blank form manager. Create empty (printable) forms that match data entry screens
CMP & earned value, based on workflow step completion
- Object hierarchies:
- Document hierarchies, sub-documents (for placeholders for planning drawing lists)
Task hierarchies, sub-tasks (for inspection & sign-off hierarchies)
- Work package management
Resource management & scheduling
- Contract clause manager
- Scope management
Quantity take-off & BOQ preparation
Quantity tracking & reconciliation
- Invoice reconciliation
Project archive. Project complete & no updates can be made. Archive users can:
See & download project information
Add & search for commentary (which is separate from the original commentary)
Vendor portal. External users (vendors, suppliers) able to submit (upload files) to project
- Files go into the unattached file queue in the folder assigned to the vendor
- Configurations (probably) possible with the current system
- Project proposal manager
Change management & change orders
- Punch list manager
Risk management & risk register
- Claims manager
Site query & instructions manager
- Correspondence management (handles documents/revs, tasks, and emails)
- Internal external routing
Inspections & audit manager
- Blank forms for inspectors
- Procurement management
User Features
- Document, Task, Transmittal Codes
- Generic codes based on classification fields
- Generic codes based on auto-incrementing serial numbers (with a fixed prefix)
- Ability to have multiple/alternate generic codes for documents, tasks, transmittals, etc.
- Reporting
- Object History
- History recording (data collection into system event table)
- History display
- Classification system report. List all classification lists for each object type
- System status report for administrators. Number of docs, revs, task, etc.
- Capture V2 lists as revisions of documents or tasks
- Object History
- Data Browsing
- Classification browser
- File browser
- Full-text search within files
Object navigation via classification lists & trees
- Org chart browser
- External Interfaces
- Excel integration. E.g. Using Excel for uploading document/task metadata
- File dump
- Mass import of files
- Metadata dump
- XML/JSON interface for integration with external systems
- Transmittals
- Recipient/revision reporting for transmittals. E.g. who got what/when?
- Recipient lists
- Outgoing project email (E-mail memorandum). E.g. like transmittal without document
- Document metadata transmittal (send a PDF of the Document/Revision detail page)
- Task transmittals
- Scheduled transmittal that are sent automatically, provided the transmittal's workflow is complete
Alternate version: only the documents that are ready
Blog & Web Site
- Project blog
- Project website
- Public documents
- Public web pages
- Static web pages
- Text markup
- Classification
- Ability to import additional classification schemes from product catalog
- Keyword classifications
- Dashboard
- Customizable user dashboards
- Possible widgets:
- Quick note entry
- Quick file upload
- Email queue
- Notes queue
- New items queue: Revisions, Tasks, Users, etc.
- Calendar
- Project diary entries
- Recent project posts (part of project blog)
RFA Forum - Request for Advice. Users can ask questions & answering real time
- Who is online
- Chat
- Filtering based on:
- Access rights
- Places in the folder structure
- Places in organizational chart (group or individual user)
- Places in classification schemes
- Workflow status
- Attached/unattached status
PDF versions of lists & detail screens stored as documents/revisions
- Revision locking. E.g. users can lock a revision indicating that they are working on it
- Translation into German
- User Convenience Features
- Automatic filing of files, based on folder
Default metadata templates for accelerating data entry
- Based on a combination of object type, folder, org chart, etc.
- Ability to edit multiple documents/revisions/tasks at once
- Update operations on all items in a dossier
- Grid-style editing. E.g. editing metadata in an Excel-like grid
Technical Features
Partitioning metadata & documents into secure & public servers
- Satellite caching servers for areas with poor internet connectivity
System limits. Enforce the maximum number of users, documents & recipients allowed
Deployment Features
- Online purchase
- Notification to staff on purchase
- Via email
- Via SMS
Operational Features
- Web analytics